Customization: | Available |
---|---|
Timer: | With Timer |
Remote Control: | With Remote Control |
Still deciding? Get samples of US$ 200/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
JH801 Portable Household Air Cooler
1. 1PH ,Three-speed Aluminum material cabinet motor, 100% copper wire
2. The modified PP shell, with braked caster, Infrared remote control, open type water distributor
3. Computer PC board, LED controller shows the working state
4. Filter the air by pre-dust filters and cooling pads
5. Auto swing: left/right; Manual swing: up/down
6. The temperature display by temperature sensor
7. Health negative ionizer
8. Water pump protection function against low water level
9. Auto& manual water inlet
Item | JH801 |
---|---|
Air Flow | 8000 m3/h |
Fan Speed | 3 Speed |
Rated Power | 410 W |
Fan Type | Axial |
Noise Level | <=57 dBA |
Water Tank | 57 L |
Water Consum. | 8-10 L/H |
Dimension | 800*480*1380 mm |
Net Weight | 31 kgs |
Control Method | LED Remote |
Cover Area | 50-70 m2 |
Humidity Display | Yes |
Ionizer | Yes |
Features | Ionizer, Temperature Display, Auto Swing(Left/Right), Pump Protection, Auto Water Inlet |
1.Q:Are you manufacturer or trade company?
A:We are the professional manufacturer of infrared heaters and evaporative air coolers.
2.Q:How can I get the samples?
A:We appreciated that you can accept to pay the sample cost and sample freight.
3.Q: What's delivery time for samples?
A:Samples will be ready for delivery in 7~15 days.
4.Q:Do you offer OEM & ODM service?
A:Yes, we do OEM/ODM as per your requests.
5. Q: What's the delivery time for an order?
A: Generally 25-35 days after receipt of deposit.